BTC $64,625.38 +0.06%
ETH $1,823.41 +0.69%
BNB $589.33 -0.21%
XRP $0.9559 +0.77%
SOL $71.02 -0.31%
TRX $0.3060 +0.55%
DOGE $0.0592 +1.63%
ADA $0.1524 -0.14%
BCH $206.32 -0.50%
LINK $9.16 -0.12%
HYPE $66.77 -0.33%
AAVE $108.25 +1.28%
SUI $0.7195 +0.24%
XLM $0.1366 -1.06%
ZEC $887.02 -1.16%
AAPL $353.88 -0.72%
AMZN $260.77 -1.01%
GOOGL $288.44 -1.22%
MSFT $524.62 +0.83%
META $629.62 -0.62%
NVDA $159.16 -1.31%
TSLA $381.26 -1.62%
SNDK $823.73 -4.35%
INTC $55.78 -3.63%
SPCX $136.63 -1.52%
MU $733.78 -3.66%
AMD $508.57 -2.96%
BTC $64,625.38 +0.06%
ETH $1,823.41 +0.69%
BNB $589.33 -0.21%
XRP $0.9559 +0.77%
SOL $71.02 -0.31%
TRX $0.3060 +0.55%
DOGE $0.0592 +1.63%
ADA $0.1524 -0.14%
BCH $206.32 -0.50%
LINK $9.16 -0.12%
HYPE $66.77 -0.33%
AAVE $108.25 +1.28%
SUI $0.7195 +0.24%
XLM $0.1366 -1.06%
ZEC $887.02 -1.16%
AAPL $353.88 -0.72%
AMZN $260.77 -1.01%
GOOGL $288.44 -1.22%
MSFT $524.62 +0.83%
META $629.62 -0.62%
NVDA $159.16 -1.31%
TSLA $381.26 -1.62%
SNDK $823.73 -4.35%
INTC $55.78 -3.63%
SPCX $136.63 -1.52%
MU $733.78 -3.66%
AMD $508.57 -2.96%

Nodal Power 完成 1300 万美元种子轮融资,推动垃圾场可再生能源转型以满足挖矿电力需求

2023-08-22 22:16:12

ChainCatcher 消息,能源公司 Nodal Power 宣布完成1300万美元种子轮融资,旨在积极遏制垃圾填埋场的甲烷排放,同时利用其潜在的能源潜力为比特币挖矿数据中心供电。

资金的很大一部分已经用于美国两个发电厂的建设和运营。第一个发电厂位于美国东南部,该发电厂设有数据中心,可在公用事业和数据中心之间高效分配能源。第二个场址位于美国西部山区,拥有一个开创性的离网比特币采矿数据中心,由垃圾填埋气提供电力。目前已计划为第三个站点的开发划拨更多资金,预计将于 2024 年初投入使用。

链捕手ChainCatcher提醒,请广大读者理性看待区块链,切实提高风险意识,警惕各类虚拟代币发行与炒作, 站内所有内容仅系市场信息或相关方观点,不构成任何形式投资建议。如发现站内内容含敏感信息,可点击,我们会及时处理。

app_icon
ChainCatcher 与创新者共建Web3世界