扫码下载
BTC $60,976.23 -0.84%
ETH $1,572.77 -3.88%
BNB $577.77 +0.38%
XRP $1.09 -1.45%
SOL $62.84 -2.10%
TRX $0.3209 -0.58%
DOGE $0.0810 -2.02%
ADA $0.1557 -2.12%
BCH $223.81 +0.95%
LINK $7.35 -0.91%
HYPE $59.54 +0.69%
AAVE $61.44 -7.89%
SUI $0.7022 +2.75%
XLM $0.1958 +4.13%
ZEC $384.96 +45.38%
BTC $60,976.23 -0.84%
ETH $1,572.77 -3.88%
BNB $577.77 +0.38%
XRP $1.09 -1.45%
SOL $62.84 -2.10%
TRX $0.3209 -0.58%
DOGE $0.0810 -2.02%
ADA $0.1557 -2.12%
BCH $223.81 +0.95%
LINK $7.35 -0.91%
HYPE $59.54 +0.69%
AAVE $61.44 -7.89%
SUI $0.7022 +2.75%
XLM $0.1958 +4.13%
ZEC $384.96 +45.38%

欧科云链数据:4 月减产月,BCH、BSV、BTC 减半将在 4 月完成

2024-04-03 11:40:26
收藏

ChainCatcher 消息,BCH减半倒计时只剩 10 小时,预计将在今晚完成,当前区块奖励为 6.25 BCH,减半后区块奖励为 3.125 BCH,目前剩余区块为 66。迈入 4 月减产月,BSV 减半预计将在 2024/04/14 完成,BTC 减半预计将在 2024/04/20 完成。

关联标签
app_icon
ChainCatcher 与创新者共建Web3世界