BTC $85,310.22 +0.51%
ETH $2,702.21 +0.68%
BNB $788.46 -0.10%
XRP $1.50 +0.57%
SOL $121.64 +1.49%
TRX $0.3353 -0.41%
DOGE $0.0951 +1.90%
ADA $0.2479 +0.67%
BCH $316.70 +0.58%
LINK $14.12 +1.40%
HYPE $89.86 +0.92%
AAVE $179.46 -0.37%
SUI $1.22 +3.81%
XLM $0.2175 +1.53%
ZEC $1,331.05 +1.97%
AAPL $333.46 +0.03%
AMZN $252.39 +0.23%
GOOGL $344.16 +0.30%
MSFT $517.89 +0.10%
META $728.48 -0.06%
NVDA $234.85 +0.13%
TSLA $372.58 +0.47%
SNDK $1,720.33 +0.22%
INTC $117.67 -0.58%
SPCX $159.03 -0.04%
MU $1,067.35 -0.39%
AMD $632.78 -0.04%
BTC $85,310.22 +0.51%
ETH $2,702.21 +0.68%
BNB $788.46 -0.10%
XRP $1.50 +0.57%
SOL $121.64 +1.49%
TRX $0.3353 -0.41%
DOGE $0.0951 +1.90%
ADA $0.2479 +0.67%
BCH $316.70 +0.58%
LINK $14.12 +1.40%
HYPE $89.86 +0.92%
AAVE $179.46 -0.37%
SUI $1.22 +3.81%
XLM $0.2175 +1.53%
ZEC $1,331.05 +1.97%
AAPL $333.46 +0.03%
AMZN $252.39 +0.23%
GOOGL $344.16 +0.30%
MSFT $517.89 +0.10%
META $728.48 -0.06%
NVDA $234.85 +0.13%
TSLA $372.58 +0.47%
SNDK $1,720.33 +0.22%
INTC $117.67 -0.58%
SPCX $159.03 -0.04%
MU $1,067.35 -0.39%
AMD $632.78 -0.04%

目标

全部
文章
快讯

first_img 三星电子加快平泽 P5 首条量产线建设,设备导入目标提前至明年二季度

ChainCatcher 消息,据 ZDNet Korea 9 月 28 日报道,三星电子正加快平泽第五园区(P5)首条量产线(Ph1)建设,并与主要设备厂商讨论将 Ph1 设备搬入目标从原定明年三季度提前至明年二季度。P5 是以 2028 年投产为目标的下一代半导体生产基地,今年三季度已开始建设 Ph1 洁净室。三星电子此前已将原定明年初完成的 P5 Ph1 洁净室建设提前约 6 个月,设备导入因此预计在明年三季度左右。业内人士称,设备搬入开始时间拟从明年 7 月至 8 月提前至明年 5 月至 6 月前后;另有人士表示,三星甚至提出明年一季度先交付设备、由其他地点暂存,显示其提前投资意愿较强。P5 第二阶段(Ph2)投资讨论也在推进。目前 Ph1 更可能建设为 DRAM 与 HBM 产线,Ph2 则更可能建设为包括第十代(V10)在内的先进 NAND 产线。设备业人士称,正式采购订单尚未下达,但三星已与合作方讨论将 Ph2 建成 NAND 产线,并因设备交付周期较长,要求提前备妥相关零部件。报道称,全球大型科技公司增加 AI 基础设施用高性能 DRAM 与 NAND 订单,而三星等存储企业产能有限。三星在 7 月二季度业绩电话会上曾表示,今年未能满足的需求将延至明年,明年供应短缺将比今年更严重,并预计短缺将持续至 2028 年。
app_icon
ChainCatcher 与创新者共建Web3世界